Engineered Spray Solutions (ESS)and the Sprayroq Structural Lining product have proven to be a most reliable and effective combination of resources to repair and rehabilitate the aging wastewater infrastructure in the City of Tarpon Springs.Over the past three years we have called on ESS to stop infiltration, make repairs and spray the Sprayroq Structural Lining to the City's most deteriorated manholes. The Sprayroq product demonstrates superior corrosion resistance and is being utilized in deteriorated and leaking structures. ESS is very timely and accurate with all proposal requests and once a purchase order is issued the ESS schedule is communicated and work usually begins in a timely manner. The ESS crews are well trained, very professional, and complete work as proposed. All ESS manhole work is tested by the spark testing method.In recent months the City has contracted with ESS to rehabilitate one sewer lift station and 15 sanitary sewer manholes. I am looking forward to working with ESS on these projects and the manholes to be rehabilitated in the 2023 fiscal year's budget.I would recommend Engineered Spray Solutions and the Sprayroq Structural Lining System to any municipal waste water department manager interested in rehabilitating the manholes and lift stations in their community.
Stephen SchwartzWaste water Collections Supervisor, City of Tarpon Springs
The City of Clearwater, FL has a successful multiple year working relationship with Engineered Spray Solutions (ESS) the Sprayroq Certified Partner for the State of Florida. And, from a City Engineer’s prospective Clearwater has benefited greatly by specifying the Sprayroq Polyurethane Structural Lining System for all our manhole and lift station rehabilitation requirements. It is because of the professionalism, excellent communications and outstanding workmanship the City of Clearwater has entered into a three -year contract with ESS beginning on February 1st, 2019. The contract awarded to ESS is for the rehabilitation of approximately 330 of our city’s beachside manholes and numerous deteriorated lift stations through the community. The structural enhancing properties of the Spraywall Polyurethane product for severely deteriorated wastewater structures was chosen specifically to rehabilitate the existing manholes and lift stations in lieu of complete removal and replacement. And, worth noting, the quick set / cure time allows us to return to service for all lined structures in a matter of 30 minutes or less from the time the product is sprayed onto the walls of any structure we have done to date. To date, ESS has completed over three (3) area basins of structural manhole rehabilitation without any issue or my concerns. The owner, Lewis Collier and the rest of the ESS team have been easy to schedule and very efficient in the cleaning, infiltration control, repairs and lining process. At the end of each manhole lining ESS will perform an electronic holiday test on the interior wall of each structure to ensure a pinhole free monolithic lining. The ESS process is quick and efficient with the Spraywall product. The city of Clearwater is impressed with the finished Sprayroq product and would certainly recommend Engineered Spray Solutions LLC to others municipal managers or civil engineers
Jeff Walker P.E.CBO, Jeff Walker P.E
Engineered Spray Solutions (ESS) and the Sprayroq Structural Lining product have proven to be a most reliable and effective combination of resources to repair and rehabilitate the aging wastewater infrastructure in the City of Ocoee. Over the past two years we have called on ESS to stop infiltration, make repairs and spray the Sprayroq Structural Lining to the City’s most deteriorated manholes. The Sprayroq product demonstrates superior corrosion resistance and is being utilized in newly installed structures. ESS is very timely and accurate with all proposal requests. And, once a purchase order is issued the ESS schedule is communicated and work usually begins the next day. The ESS crews are well trained, very professional and complete work as proposed. All ESS manhole work is tested by the spark testing method. In recent months the City has contracted with ESS to rehabilitate two major sewer lift stations. I am looking forward to working with ESS on the two lift station projects and the manholes to be rehabilitated in the 2020 fiscal year’s budget. I would recommend Engineered Spray Solutions and the Sprayroq Structural Lining System to any municipal wastewater department manager interested in rehabilitating the manholes and lift stations in their community.
Roger DensbergerFormer Chief Utilities Inspector, City of Ocoee
As you know the City of Edgewater, FL has called on Engineered Spray Solutions to stop infiltration in some of the City’smost deteriorated manholes and lift stations.Over the past 12 months, ESS has spray applied the Sprayroq Structural Lining System to dozens of deteriorated manholes throughout our community. Because the ESS crews are professional and well trained, work orders are completed on time. It is comforting to know that each manhole is tested and passesa high voltage spark test. Recently, ESS has been issued a new City Purchase Order for the 2020 physical year’s budget to repair and structurally rehabilitate an additional fifteen (15) manholes.I am looking forward to working with Michael and the ESS crew to complete this project. I would recommend ESS and the Sprayroq Structural Lining System to anyone interested in rehabilitating their aging wastewater infrastructure.
Beau GriffinCity of Edgewater
I have worked with Engineered Spray Solutions (ESS) on several large and complex structural lining projects in Central Florida over the past two years. This company maintains high standards for customer service, quality of work of their Sprayroq lining and dependability to get the most difficult projects completed on demanding schedules. A difficult and complex master lift station project at Reedy Creek Improvement District (RCID) is an outstanding example of ESS’s ability to coordinate with a demanding owner Walt Disney World, a general contractor with a very critical time frame and the coordination of several ESS subcontractors to complete the structural lining requirements of Lift Station #7. At the conclusion of the project the Sprayroq Structural lining System was successfully applied and spark tested to ensure a pinhole free lining for one of RCID’s largest lift stations. As a result of the successful completion of this demanding project I would recommend ESS to any of my client municipal managers or civil engineers involved in wastewater structural rehabilitation.
Janine Alexander, PEProject Manager II, Tetra Tech
Engineered Spray Solutions (ESS) and the Sprayroq Structural Lining product Spraywall have proven to be a most reliable and effective combination of resources to repair and rehabilitate the aging wastewater infrastructure within the TOHO Water Authority System. Over the past three years we have called on Engineered Spray Solutions for emergency repairs to stop water infiltration, make concrete repairs and spray the Sprayroq Structural Lining to our deteriorated manholes and lift stations. ESS is very timely and accurate with all proposal requests. And, once a purchase order is issued the ESS schedule is communicated and work usually begins within the next day. The ESS crews are well trained, very professional and complete work as proposed. All ESS manhole work is tested by the spark testing method. In recent months TOHO has signed a multi-year contract with ESS to further rehabilitate our wastewater infrastructure. I am looking forward to working with ESS on our monthly project releases to rehabilitate several hundred leaking manholes.
James Johnson,Project and Logistic Foreman, Toho Water Authority
Engineered Spray Solutions, LLC. was awarded contract #2016-401 with Sarasota County on August 23, 2016. This is a unit price contract for 3 years with 2 optional renewals. They are presently in the first year’s renewal period. They have completed 16 work assignments to date and currently working on the 17th. At the beginning of each work assignment a Notice to Proceed is issued with a 120 calendar day schedule to reach Substantial Completion and another 30 calendars days to Final Completion. All Substantial or Final Completion dates have been met on time or ahead of schedule. During the construction, Engineered Spray Solutions, LLC performed their work in a very professional and experienced manner. Interaction with County staff and the residents of Sarasota County have been very productive and professional. They have currently coated 181 manholes, 22 lift stations, and the headworks at out largest Water Reclamation Facility. Their team will engineer the coating utilizing the water table and depth to ensure thickness for each structure and or manhole will be structurally sound. Our Substantial Completion walk-throughs have produced relatively short punch lists with only minor items to be attended to, which shows the attention to detail that this company provides and the pride they take in their work. Most importantly, the projects have met all the criteria set forth by Sarasota County.
Jason K. Brown,Construction Project Manager, Sarasota County